ACL Digital

Home / CaseStudy / Optimizing Brew House Efficiency With Advanced Automation

Optimizing Brew House Efficiency With Advanced Automation

Optimizing Brew House Efficiency With Advanced Automation

Optimizing Brew House Efficiency banner

Overview

A leading brewing enterprise aimed to reduce its brew house cycle time from 3 hours to 2.5 hours to improve efficiency and throughput across key processes. The client partnered with ACL Digital to implement an advanced automation solution covering system design, development, testing, and commissioning to enable streamlined operations.

Download Case Study








    Challenges

    Extended Cycle Times

    Manual interventions and lack of process synchronization increased the overall brew house cycle duration

    Limited Process Visibility

    Lack of centralized monitoring restricted real-time insights and delayed decision-making

    Inconsistent Process Control

    Variability in parameters across brewing stages led to inconsistent output quality and inefficiencies

    Fragmented Automation Architecture

    Disconnected systems across milling, mashing, fermentation, and downstream processes created coordination gaps

    Inefficient Testing and Commissioning

    Lack of simulation capabilities increased deployment risks and extended commissioning timelines

    Solution

    ACL Digital delivered the project through structured phases, ensuring a systematic and risk-controlled implementation

    • ControlLogix PLC-Based Control System Implementation: Enabled precise process control and improved coordination across the brew house
    • iFIX SCADA Implementation: Provided centralized monitoring, real-time visualization, alarm management, and operator control
    • Integrated Process Automation: Unified control across all stages including milling, mashing, fermentation, filtration, and packaging
    • Simulation-Driven Validation: Enabled simulation to validate logic and reduce risks before deployment
    • Pre-Commissioning and Commissioning: Executed dry and wet commissioning phases to ensure system reliability and seamless go-live
    Otimizing

    Outcomes

    Optimizing Brew House Efficiency outcome
    Scroll to Top